Machine Foming de panneau "sandwich" de tôle d'acier de couleur
Obtenir le dernier prixType de paiement: | L/C,T/T |
Incoterm: | FOB,CFR,CIF |
Quantité de commande minimum: | 1 Set/Sets |
transport: | Ocean,Land |
Hafen: | Tianjin New Port |
Type de paiement: | L/C,T/T |
Incoterm: | FOB,CFR,CIF |
Quantité de commande minimum: | 1 Set/Sets |
transport: | Ocean,Land |
Hafen: | Tianjin New Port |
Modèle: XF980 Sandwich Panel Foming Machine
marque: XF
Unités de vente | : | Set/Sets |
Type de colis | : | Nous avons des techniciens professionnels pour le chargement Garanti le chargement des marchandises dans le conteneur sans aucun dommage. |
The file is encrypted. Please fill in the following information to continue accessing it
Machine Foming de panneau "sandwich" de tôle d'acier de couleur
Machine Foming de petit pain de panneau "sandwich", Ligne de production de panneaux composites, Equipement de panneau sandwich EPS
Groupes de produits: Machines de fabrication et de transformation> Machines de fabrication de matériaux de construction
Machine de fabrication de tuiles > Machine de fabrication de panneaux sandwiches EPS
Machine Foming de panneau "sandwich" de tôle d'acier de couleur
Paramètres détaillés de l'équipement d' équipement de panneau sandwich EPS
No |
Forming Machine Parameter |
|
1
|
Suitable Material |
Colored Steel plate, Galvanized board |
2
|
Width of the raw material |
1000/1200mm |
3 |
Total Power |
28KW |
4 |
Thickness of raw material |
0.3-0.7mm |
5 |
Thickness of Panel |
50-200mm |
6 |
Machine Length |
23500x2440x2450mm |
7 |
Weight |
9600KG |
7 |
Speed |
0-4m/min |
8
|
Voltage |
380V 50Hz 3phases |
Composant de machine d' équipement de panneau sandwich EPS
Decoiler 1 It adopts coil holder with break device. 2 Loading capacity: Less than 6T 3 Width: 1200mm Roll Forming Machine 1 Main Frame: 300 H steel welding 2 Main Board:14mm 3 Shaft diameter:70mm 4 Roller Station:15row(Roller material 45# steel,roller surfaces polishing, hard plating) 5 transmission way: chain draive 6 Power:3KW 7 Feeding Device has pre-cutter 8 Size::7260X2050X670mm 9 Weight:About 3T Composite Part 1 This part including: Press rib, glue, heating, combine, slotting, ending and pneumatic move up and down. 2 Main machine adopts frequency conversion 3 Thickness adjustable by electric 4 Shaft of combine shaft:150mm, material is steel with rubber cover,to avoid any wear 5 Foam machine has 18 roller shaft, Rib rollers 6 rows 6 Transmission Way:Transmission and chain drive 7 :Reduction box power: Foam machine 3KW,with reduction box. 8 Main frame adopts square tube welding ,to make sure machine is stable and work smoothly Size:11.5X2.3X2.5m Electric system 1 Control: DELIXI low-voltage apparatus 2 Specification :programmable PLC and Delta PLC, double calculator, to insure the length 3 7inch touch screen ,failure warning Cutting Part 1 Non stop cutting , Pre-cutter can cut the length automatically 2 Pneumatic pressing device, control the cutter. And back to revious after cutting. 3 Cutting method: saw and cutter 4 Power:4KW 5 Size:1750X2520X1850mm 6 Weight:700KG. Feeding material of composite and roll forming part:1200mm Stacking Part 1 It adopts angle iron and square tube 2 Every stacker has 4 roller 3 Size; 3X1.3X0.8m 4 holding hook 1 piece, uncoiler core: 4 pieces, uncoiler holding part: 1 piece |
No. |
set |
Name |
No. |
Set |
Name |
1 |
1 |
Uncoiler |
15 |
2 |
remain glue reciver |
2 |
1 |
Main composite machine |
16 |
4 |
Uncoiler core |
3 |
2 |
Cutting machine |
17 |
1 |
φ250milling cutter |
4 |
2 |
Transport table |
18 |
18 |
Adjusting block |
5 |
1 |
Roll forming machine |
19 |
25m |
Plastic foam |
6 |
1 |
foam holder |
20 |
20m |
Bubble wrap |
7 |
4 |
Holder pipe |
21 |
1 |
Pipe tip |
8 |
1 |
coil uncoiler |
22 |
1 |
seal gum |
9 |
1 |
ladder fence |
23 |
2 |
chuck |
10 |
1 |
coil hook |
24 |
2 |
filter screen |
11 |
6 |
dropper |
25 |
2m |
sponge |
12 |
3 |
Branking vane |
26 |
1 |
Fluorescent tube |
13 |
6 |
hopper |
27 |
6 |
Infrared ray heating tube |
14 |
4 |
Glue brush |
|
|
|
Mode de paiement:
Méthode 1: dépôt de 30% par T / T à l'avance et solde de 70% après confirmation de l'inspection avant expédition
Méthode 2: L / C est également acceptable.
Installation, mise en service, test et formation
1. Les ingénieurs du vendeur doivent superviser l'installation sur le site et effectuer la mise en service.
Ils doivent commencer dans les 10 jours après avoir reçu les informations de l'acheteur.
2. L’acheteur doit payer les billets d’avion internationaux et le local, tels que l’hébergement, le transport quotidien, la communication, les assurances,
etc. L'acheteur doit payer USD 100 / jour / personne au vendeur pour la mise en service.
3. L'acheteur préparera un interprète pour une meilleure communication entre les deux parties.
Vous cherchez un rouleau de toiture idéal formant la machine Fabricant et fournisseur? Nous avons une large sélection à des prix imbattables pour vous aider à faire preuve de créativité.
Tous les rouleaux de toiture formant la machine sont de qualité garantie. Nous sommes Chine Origine Usine de Rouleau Formant La Machine
Si vous avez des questions, n'hésitez pas à nous contacter.
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.